| Tipo di corso | Master |
| Metodo | In aula |
| Categoria | Geologia |
| Sede del corso |
COREP - Corso Trento 13 -
TORINO (TO) |
| Periodo di svolgimento | dal 16/11/2009 al 29/10/2010 durata 730 ore |
| Costo | € 5000,00 |
| Referente | Luisa Rosano |
The need of experts involved in D&B and in TBM tunnelling as well as tunnel work site management is rapidly increasing throughout the world. The necessary qualifications to cover these roles cannot be supplied by the first and second level University Courses, but a specially drawn up course is needed.
The Politecnico di Torino has developed and organized this Post-Graduate Master Course, endorsed by ITA/AITES (International Tunnelling Association). In this course University lectures are merged with lectures and presentations by experts from construction companies, machines producers, design companies and professional to provide the multidisciplinary knowledge that is necessary to work in the tunnelling sector.
For further informations: http://www.tunnel.formazione.corep.it/tunnel09/index.html
2 months of stage in a tunnel construction site or in a tunnelling design company and a thesis work, in Italy and/or abroad